4/5/19
This week we met to continue doing verification testing. We added a resistor to the circuit to lower the transmission voltage to get it into our design specification range. We also tested our battery life, but we are having trouble with the battery charger so we may need to buy a new one, so we are working on testing the recharge duration. We also completed the Risk Analysis part of the paper and now we are working on writing the Verification part. Dr. MacEwan said our current mesh harvester should be in this week so we are hoping we will be able to go pick that up and start validation tests ASAP.
This week we met to continue doing verification testing. We added a resistor to the circuit to lower the transmission voltage to get it into our design specification range. We also tested our battery life, but we are having trouble with the battery charger so we may need to buy a new one, so we are working on testing the recharge duration. We also completed the Risk Analysis part of the paper and now we are working on writing the Verification part. Dr. MacEwan said our current mesh harvester should be in this week so we are hoping we will be able to go pick that up and start validation tests ASAP.